Caversham Heights Photographs - 2010 refurbishment After long discussion and much thought, in the Autumn of 2010 we carried through a project to re-order the worship area of our church. The first stage (end of October 2010, above) was to remove the pews. The two images alongside show the result. The grey chairs have been re- arranged, and some additional chairs from the Hall brought into the church, to provide as much continuity as possible over the three or four weeks of the project.